NEWS

BME studio final review (undergraduate)

The final review session for BME Studio was held on May 30th, with guests including Dimasio Museum of Art, Niikappu Development Joint Venture, Aizawa High Pressure Concrete, and madsaunist. Approximately one and a half months after the site survey, five participants presented a sauna building that utilized 3D printing in 10 minutes.

Click here for BME Studio → The results of the four-way scoring were as follows. Best idea / Shunsuke Yamaguchi 116.5 points Excellent idea / Masato Abe 115 points

NEWS Categories

NEWS Pick up
  1. 炭酸化速度
  2. さまざまな手法による空隙分布
PAGE TOP